Software Advice offers objective insights based on verified user reviews and independent product and market research. When our advisors match you to a software provider, we may earn a referral fee.

Overview

[Reviews](https://www.softwareadvice.com/construction/bridgit-bench-profile/reviews/)[Alternatives](https://www.softwareadvice.com/construction/bridgit-bench-profile/alternatives/)

# Bridgit Bench Review

Custom quote 1 plan

Wondering if Bridgit Bench is right for your organization?

Our Construction Management Software selection experts can help you in 15 minutes or less.

On this page

-   Overview
    
-   User Interface
    
-   Popular Alternatives
    
-   Pricing and Plans
    
-   Features
    
-   Integrations
    
-   User Reviews
    
-   Popular Comparisons
    

## Overview

Bridgit Bench

4.7

[(74)](https://www.softwareadvice.com/construction/bridgit-bench-profile/reviews/)

FrontRunner 2026

Pricing

Pricing available upon request

### About Bridgit Bench

Bridgit Bench is a construction resource management software designed to support workforce planning and project delivery. It is used by general contractors, self-perform contractors, and subcontractors in regions such as North America, the United Kingdom, Australia, and New Zealand. The software is utilized by workforce and operations teams, project managers, superintendents, human resources departments, and business development professionals to manage construction workforce strategies.

The platform includes an AI assistant tailored for construction workforce planning, which analyzes workforce data to provide actionable insights. Internal resume features offer detailed employee profiles, including certifications, project experience, skills, and collaboration history, helping organizations align team members with suitable projects. Forecasting tools enable analysis of supply and demand, utilization rates, bench costs, and hiring needs by comparing project requirements with team capacity and skillsets. Project planning tools include features such as smart suggestions, a project hub, map view, roles and assignments management, time off tracking, and a mobile application. Communicatio...

n tools, including alerts, broadcasts, and messaging, support team coordination. The software consolidates workforce, project, and pipeline data by integrating information from various sources. It provides tools to eliminate data silos, ensuring accurate information is available for labor planning.

Do you work for Bridgit Bench? [Manage this product listing](https://www.g2.com/products/bridgit-bench/claim_requests/new?auto=true)

Wondering if Bridgit Bench is right for your organization?

Our Construction Management Software selection experts can help you in 15 minutes or less.

## Bridgit Bench User Interface

## Popular Bridgit Bench Alternatives

Main Product

Bridgit Bench

4.7

[(74)](https://www.softwareadvice.com/construction/bridgit-bench-profile/reviews/)

Ratings Breakdown

-   4.70Ease of use
-   4.56Value for money
-   4.86Customer support
-   4.41Functionality

Pricing

Available upon request

Get Price

Alternative Product

[Contractor Foreman](https://www.softwareadvice.com/construction/contractor-foreman-profile/)

4.5

[(842)](https://www.softwareadvice.com/construction/contractor-foreman-profile/reviews/)

Ratings Breakdown

-   4.28Ease of use
-   4.62Value for money
-   4.51Customer support
-   4.40Functionality

Pricing

Starting at $49.00 per month

Get Price

Alternative Product

[Houzz Pro](https://www.softwareadvice.com/construction/houzz-pro-profile/)

4.3

[(1088)](https://www.softwareadvice.com/construction/houzz-pro-profile/reviews/)

Ratings Breakdown

-   4.17Ease of use
-   4.02Value for money
-   4.26Customer support
-   4.16Functionality

Pricing

Starting at $399.00 per month

Get Price

Alternative Product

[Autodesk Forma (formerly Autodesk Construction Cloud)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/)

4.3

[(2212)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/reviews/)

Ratings Breakdown

-   4.17Ease of use
-   4.01Value for money
-   4.18Customer support
-   4.15Functionality

Pricing

Available upon request

Get Price

Alternative Product

[Procore](https://www.softwareadvice.com/construction/procore-profile/)

4.5

[(2680)](https://www.softwareadvice.com/construction/procore-profile/reviews/)

Ratings Breakdown

-   4.36Ease of use
-   4.13Value for money
-   4.53Customer support
-   4.33Functionality

Pricing

Available upon request

Get Price

Alternative Product

[Trimble e-Builder](https://www.softwareadvice.com/construction/e-builder-enterprise-profile/)

4.3

[(418)](https://www.softwareadvice.com/construction/e-builder-enterprise-profile/reviews/)

Ratings Breakdown

-   4.04Ease of use
-   4.12Value for money
-   4.26Customer support
-   4.15Functionality

Pricing

Available upon request

Get Price

## Bridgit Bench Pricing and Plans

Bridgit Bench has one plan. Bridgit is custom-priced.

Bridgit

Contact vendor for details

No plan information available

Confused about pricing? We've got you covered.

Get a personalized pricing breakdown tailored to your specific needs—no guesswork, no generic estimates.

### How does Bridgit Bench pricing compare to alternatives?

Explore how Bridgit Bench's pricing and plan options compare with top alternatives below.

| Product | Starting price | Free trial | Free version | Value for Money |
| --- | --- | --- | --- | --- |
| Bridgit Bench4.7[(74)](https://www.softwareadvice.com/construction/bridgit-bench-profile/reviews/) | Pricing available upon request | Not available | Not available | 4.6 |
| [Contractor Foreman](https://www.softwareadvice.com/construction/contractor-foreman-profile/)4.5[(842)](https://www.softwareadvice.com/construction/contractor-foreman-profile/reviews/) | $49.00 /mo | Available | Not available | 4.6 |
| [Houzz Pro](https://www.softwareadvice.com/construction/houzz-pro-profile/)4.3[(1,088)](https://www.softwareadvice.com/construction/houzz-pro-profile/reviews/) | $399.00 /mo | Available | Available | 4.0 |
| [Autodesk Forma (formerly Autodesk Construction Cloud)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/)4.3[(2,212)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/reviews/) | Pricing available upon request | Not available | Not available | 4.0 |
| [Procore](https://www.softwareadvice.com/construction/procore-profile/)4.5[(2,680)](https://www.softwareadvice.com/construction/procore-profile/reviews/) | Pricing available upon request | Not available | Not available | 4.1 |

Bridgit Bench4.7[(74)](https://www.softwareadvice.com/construction/bridgit-bench-profile/reviews/)

* * *

Starting price

Pricing available upon request

Free trial

Not available

Free version

Not available

Value For Money

4.6

-   [Contractor Foreman](https://www.softwareadvice.com/construction/contractor-foreman-profile/)4.5[(842)](https://www.softwareadvice.com/construction/contractor-foreman-profile/reviews/)
    
    * * *
    
    Starting price
    
    $49.00 /mo
    
    Free trial
    
    Available
    
    Free version
    
    Not available
    
    Value For Money
    
    4.6
    
-   [Houzz Pro](https://www.softwareadvice.com/construction/houzz-pro-profile/)4.3[(1,088)](https://www.softwareadvice.com/construction/houzz-pro-profile/reviews/)
    
    * * *
    
    Starting price
    
    $399.00 /mo
    
    Free trial
    
    Available
    
    Free version
    
    Available
    
    Value For Money
    
    4.0
    
-   [Autodesk Forma (formerly Autodesk Construction Cloud)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/)4.3[(2,212)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/reviews/)
    
    * * *
    
    Starting price
    
    Pricing available upon request
    
    Free trial
    
    Not available
    
    Free version
    
    Not available
    
    Value For Money
    
    4.0
    
-   [Procore](https://www.softwareadvice.com/construction/procore-profile/)4.5[(2,680)](https://www.softwareadvice.com/construction/procore-profile/reviews/)
    
    * * *
    
    Starting price
    
    Pricing available upon request
    
    Free trial
    
    Not available
    
    Free version
    
    Not available
    
    Value For Money
    
    4.1
    

## Bridgit Bench Features

-   Popular features found in Construction Management
    
    Budget Tracking
    
    Contract/License Management
    
    Contractor Management
    
    Equipment Tracking
    
    Estimating
    
    Inventory Management
    
    Mobile Access
    
    Reporting & Statistics
    
    Subcontractor Management
    
    Task Management
    
    Timesheet Management
    
-   More features of Bridgit Bench
    
    Access Controls/Permissions
    
    API
    
    Bid Management
    
    Budgeting/Forecasting
    
    Calendar Management
    
    Collaboration Tools
    
    Commenting/Notes
    
    Compliance Tracking
    
    Cost Estimating
    
    Customizable Reports
    
    Document Management
    
    For AEC Industry
    
    For Small Businesses
    
    Gantt/Timeline View
    
    Multiple Projects
    
    Project Management
    
    Project Time Tracking
    
    Project Tracking
    
    Real-Time Data
    
    Real-Time Updates
    
    Reporting/Analytics
    
    Reporting/Project Tracking
    
    Resource Management
    
    Scheduling
    
    Status Tracking
    
    Subcontractor Monitoring
    
    Third-Party Integrations
    
    Time Tracking
    

## Bridgit Bench Integrations

Procore

Integration rated undefined from -1 review

Airtable

Integration rated undefined from -1 review

BambooHR

Integration rated undefined from -1 review

BuildingConnected Pro

Integration rated undefined from -1 review

Unanet CRM

Integration rated undefined from -1 review

HubSpot CRM

Integration rated undefined from -1 review

See all 11 integrations

## Bridgit Bench User Reviews

## Bridgit Bench customer ratings

- Overall rating: 4.7/5
- Total reviews: 74

### Rating distribution

- 5 stars: 51 reviews (69%)
- 4 stars: 22 reviews (30%)
- 3 stars: 1 reviews (1%)
- 2 stars: 0 reviews (0%)
- 1 star: 0 reviews (0%)

### Secondary ratings

- Ease of use: 4.7/5
- Value for money: 4.6/5
- Customer support: 4.9/5
- Functionality: 4.4/5

---

### Great product

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 1001-5000 employees
- Product usage: 1-3 years · weekly
- Reviewed: October 2024
- Review source details: This review was submitted organically. No incentive was offered

Overall extremely positive experience; we deployed Bridgit first within a couple of select divisions within our company and then rolled the product out enterprise-wide and this has been well received by our teams. Very user friendly interface and there is a multitude of integrations with various platforms that have allowed us to manage our workforce and be proactive with our planning.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 4/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

Overall, one of the biggest benefits is that the product is very user friendly. Visual Gantt chart by projects is seamless and provides a quick and easy resource to help plan. Bridgit allows for easy customization of filters to see and sort the data in virtually in any fashion the user desires. The product also allows for easily generated reports to help in workforce planning meetings/updates. The ability to track proximity of staff to jobsite locations is a great asset when developing potential resources for a project or opportunity, especially in a metro location where travel/traffic are true barriers. Mobile platform/app is very easy to use and intuitive.

#### Cons

Nothing comes to mind at this time; we are currently working through integrations to various technology platforms.

---

### Great Tool to Use!

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 501-1000 employees
- Product usage: less than 1 year · daily
- Reviewed: March 2025
- Review source details: This review was submitted organically. No incentive was offered

My overall experience with Bridgit Bench has been very positive. The platform has greatly enhanced our project management capabilities, allowing us to efficiently plan resources. The user-friendly interface makes it easy to navigate and utilize its features effectively. While there have been occasional technical issues, they are relatively minor compared to the significant benefits we’ve gained. (Before we were using spreadsheet for tracking). In summary, Bridgit Bench has proven to be a valuable asset for our organization, streamlining our processes and contributing to more successful project outcomes. I highly recommend it to anyone looking to enhance their resource management and planning efforts.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

What I liked most about Bridgit Bench is its intuitive user interface and powerful functionality. The platform streamlines workforce planning and resource management, making it incredibly easy to visualize project timelines and allocate resources effectively. The real-time data updates allow for quick adjustments, which is essential in the fast-paced construction environment.

#### Cons

What I liked least about Bridgit Bench is that it sometimes experiences technical issues, particularly when adding a new project or saving date changes. Occasionally, I encounter errors that require me to redo the entry. However, I want to emphasize that this is not a significant drawback and does not overshadow the overall effectiveness of the platform. The benefits of Bridgit Bench far outweigh these minor inconveniences.

---

### Bridgit Bench - Best Tool in the Technology Tool Box.

- Overall rating: 3/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 51-200 employees
- Product usage: less than 1 year · daily
- Reviewed: August 2020
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

Overall it has been a wonderful addition to our technology tool box. We need to track over a hundred projects at any point in time and all of the resources that go with them, Bridgit allows us to make sure we have the right people in the right place at the right time.

#### Ratings breakdown

- Ease of use: 4/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 4/5

#### Pros

The product is very intuitive. I love that you can view your projects as both a list and as a Gantt chart and that you can deep dive into the details of the project by clicking on the project name from any view. Being able to see the dates of each project phase by hovering over the Gantt bar is a huge benefit because I can go from project to project without leaving the Gantt view.

#### Cons

I like that we can identify each project phase by date and when building out the phases it automatically starts the next phase with the date following the last phase but editing the phases when you have 8 or more phases like we do is a big chore. It would be a huge time savings if one phase date could be edited and have all subsequent phases adjust accordingly, or alternatively, if you could drag phase dates on the Gantt chart.

---

### Easy Rollout & Great Support Team

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 201-500 employees
- Product usage: 1-3 years · daily
- Reviewed: July 2025
- Review source details: This review was submitted organically. No incentive was offered

Overall, it was a really smooth experience. The integration was easy, and their team was great to work with — super responsive and helpful throughout the process. It made getting up and running a lot easier than we expected.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 4/5

#### Pros

I really liked how easy it was to use. The layout is super clean, and it made moving people around on projects quick and straightforward. Being able to see who’s available and who’s overloaded at a glance was really helpful. I also liked the filters — it’s nice to be able to sort by role or region and actually get useful info without digging. Overall, it felt like it was built with construction teams in mind.

#### Cons

There were a few areas where we wished we had a little more flexibility, like customizing fields to match our internal needs. Nothing major — just some small things we’d tweak to better fit how we work.

---

### 2 Years with Bridgit Bench

- Overall rating: 4/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 501-1000 employees
- Product usage: 1-3 years · weekly
- Reviewed: August 2025
- Review source details: This review was submitted organically. No incentive was offered

Overall user experience is great. Easy to use, powerful filtering, search, and placement tool for available resources.

#### Ratings breakdown

- Ease of use: 3/5
- Value for money: 3/5
- Customer support: 4/5
- Functionality: 4/5

#### Pros

The user interface is intuitive and easy to use that custom built apps. The ability to filter and sort through resources with the smart selection tool is great.

#### Cons

Our system is currently not completely automated with our HRIS system. It would be great to track new hires and terminations automatically.

---

### A very happy user

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 11-50 employees
- Product usage: less than 1 year · daily
- Reviewed: July 2025
- Review source details: This review was submitted organically. No incentive was offered

Overall my experience with Bridgit has been very positive. The program is very easy to use and the support from the developer has been great.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

This program is a very easy program to learn and start using. It is very easy to make changes or to correct mistakes.

#### Cons

There is really not anything about Bridgit that I can complain about. This is a very user friendly program and is easy to learn.

---

### Bridgit Bench at a Commercial GC

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 501-1000 employees
- Product usage: 3-5 years · daily
- Reviewed: March 2025
- Review source details: This review was submitted organically. No incentive was offered

Easy implementation, easy adoption, efficient management and planning of internal resources.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 4/5

#### Pros

Bridgit does a great job of providing companies with a lot of flexibility on the back-end to configure the product to their specific business needs - while keeping the front-end very intuitive, but powerful. That is a hard balance to strike.

#### Cons

It was hard to come up with one, but if I'm nitpicking, I wish there was a better way to extract the data out of Bridgit to use to various reporting/dashboarding e.g. Microsoft Data Connector for PowerBI. Currently all data needs to be extracted through APIs.

---

### Great System!!

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 201-500 employees
- Product usage: 1-3 years · daily
- Reviewed: February 2025
- Review source details: This review was submitted organically. No incentive was offered

Overall experience has been really good, captures the data and experience needed to allocate resources.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

Bridgit is very user friendly. Relatively easy to learn the functions and teach them to new users.

#### Cons

Some of the functionality of allocations for the field staff, they can sometimes be allocated between a few projects

---

### Great tool - and team - behind it!

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 201-500 employees
- Product usage: 1-3 years · weekly
- Reviewed: July 2025
- Review source details: This review was submitted organically. No incentive was offered

We've had BB for a few years now, and it has significantly improved the visibility we have on resource management. The software is packed with features and makes it easy to allocate and track resources efficiently. The support department is always ready to assist with queries or issues promptly. They have gone above and beyond to improve user experience and cater to our needs. Overall, we would recommend Bridgitbench to any organization looking to enhance their resource management. It's a game-changer!

#### Ratings breakdown

- Ease of use: 4/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 4/5

#### Pros

Rich features that cover a very wide span of functions and intricacies (including a variety of "human resources" topics like leave of absence, years of experience, etc).

#### Cons

When looking at a person's bandwidth (% allocation), it would be nice to include deals that are still in the works (opportunities) in that tally/percentage.

---

### Great product

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Industry: Construction
- Company size: 51-200 employees
- Product usage: 3-5 years · monthly
- Reviewed: May 2025
- Review source details: This review was submitted organically. No incentive was offered

It's great to use and has valuable information to share with our teams. The team is friendly as well.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

The ease of use when it comes to placing people on jobs. The information the system stores is also very useful when it comes to reporting and staying organized with staff allocations and availabilities.

#### Cons

Not having Workday implemented to transfer new hire profiles over to Bridgit. Also, manually having to add people's previous experience in on your template to then upload, when we have a previous template in place through MS Forms. The layout is different and will cause extra work.

---

Showing 1 - 10 of 74 Reviews

[See All Reviews](https://www.softwareadvice.com/construction/bridgit-bench-profile/reviews/)

## Bridgit Bench Popular Comparisons

[Contractor Foreman vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/contractor-foreman/)[Houzz Pro vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/houzz-pro/)[Autodesk Forma (formerly Autodesk Construction Cloud) vs Bridgit Bench](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/vs/bridgit-bench/)[Procore vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/procore/)[Trimble e-Builder vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/e-builder-enterprise/)[ConstructionOnline vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/uda-constructiononline/)[Buildertrend vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/buildertrend/)[Jobber vs Bridgit Bench](https://www.softwareadvice.com/construction/bridgit-bench-profile/vs/jobber/)

[Compare All Alternatives](https://www.softwareadvice.com/construction/bridgit-bench-profile/alternatives/)

## Other Top Recommended Construction Management Software

[Houzz Pro](https://www.softwareadvice.com/construction/houzz-pro-profile/)

**4.3** (1088)

Recently recommended **368** times

[plexxis](https://www.softwareadvice.com/construction/plexxis-profile/)

**4.4** (79)

Recently recommended **260** times

[Autodesk Forma (formerly Autodesk Construction Cloud)](https://www.softwareadvice.com/construction/autodesk-construction-cloud-profile/)

**4.3** (2212)

Recently recommended **254** times

[AccuLynx](https://www.softwareadvice.com/construction/exactlogix-acculynx-profile/)

**4.6** (847)

Recently recommended **191** times

Stuck Between Options?

Our experts can help you compare Bridgit Bench with other top options, so you can find the best fit for your needs.

## See what companies are saying about Software Advice