---
title: "Simio Software Reviews, Demo & Pricing - 2026"
description: "Review of Simio Software: system overview, features, price and cost information. Get free demos and compare to similar programs."
source_url: "https://www.softwareadvice.com/manufacturing/simio-profile/"
page_type: "product"
language: "en"
---

[Home](https://www.softwareadvice.com/)

/

[Pharmacy Software](https://www.softwareadvice.com/retail/pharmacy-comparison/)

/

Simio

Software Advice offers objective insights based on verified user reviews and independent product and market research. When our advisors match you to a software provider, we may earn a referral fee.

Overview

[Reviews](https://www.softwareadvice.com/manufacturing/simio-profile/reviews/)[Alternatives](https://www.softwareadvice.com/manufacturing/simio-profile/alternatives/)

# Simio Review

Custom quote Free version Free trial 1 plan

Wondering if Simio is right for your organization?

Our Pharmacy Software selection experts can help you in 15 minutes or less.

On this page

-   Overview
    
-   User Interface
    
-   Popular Alternatives
    
-   Pricing and Plans
    
-   Features
    
-   Integrations
    
-   User Reviews
    
-   Popular Comparisons
    

## Overview

Simio

4.7

[(104)](https://www.softwareadvice.com/manufacturing/simio-profile/reviews/)

Pricing

Pricing available upon request

### About Simio

Simio is a cloud-based and on-premise production planning and simulation solution designed to help aerospace, healthcare, manufacturing, maritime, mining, supply chain and various other industries capture detailed constraints and variations within systems and calculate production schedules by predicting potential risks.

The application helps users perform discrete event simulations, enabling supervisors to gain insights about facilities and utilize them for design and implementation tasks, resource allocation and logistics management. Using continuous simulation, stakeholders can analyze production capacity, working hours and design and layouts of workspaces within facilities. Simio Portal lets administrators publish and share simulation results, create custom reports, and provide access permissions to users. It also offers a host of other features such as what-if analysis, Gantt charts, 3D modelling, real-time risk analysis and more.

The solution provides integration with Google 3D Warehouse and Wonderware MES. Pricing is available on request and support is provided via email, phone and documentation.

Do you work for Simio? [Manage this product listing](https://www.g2.com/products/simio/claim_requests/new?auto=true)

Wondering if Simio is right for your organization?

Our Pharmacy Software selection experts can help you in 15 minutes or less.

## Simio User Interface

## Popular Simio Alternatives

Main Product

Simio

4.7

[(104)](https://www.softwareadvice.com/manufacturing/simio-profile/reviews/)

Ratings Breakdown

-   4.17Ease of use
-   4.54Value for money
-   4.59Customer support
-   4.57Functionality

Pricing

Available upon request

Get Price

Alternative Product

[Fishbowl](https://www.softwareadvice.com/manufacturing/fishbowl-inventory-manufacturing-profile/)

4.2

[(1134)](https://www.softwareadvice.com/manufacturing/fishbowl-inventory-manufacturing-profile/reviews/)

Ratings Breakdown

-   4.15Ease of use
-   4.10Value for money
-   4.26Customer support
-   4.13Functionality

Pricing

Available upon request

Get Price

Alternative Product

[SYSPRO](https://www.softwareadvice.com/erp/syspro-profile/)

4.2

[(105)](https://www.softwareadvice.com/erp/syspro-profile/reviews/)

Ratings Breakdown

-   3.95Ease of use
-   4.14Value for money
-   4.25Customer support
-   4.25Functionality

Pricing

Starting at $50.00 per month

Get Price

Alternative Product

[Katana Cloud Inventory](https://www.softwareadvice.com/manufacturing/katana-mrp-profile/)

4.6

[(171)](https://www.softwareadvice.com/manufacturing/katana-mrp-profile/reviews/)

Ratings Breakdown

-   4.56Ease of use
-   4.35Value for money
-   4.65Customer support
-   4.21Functionality

Pricing

Starting at $299.00 per month

Get Price

Alternative Product

[Odoo](https://www.softwareadvice.com/crm/odoo-profile/)

4.2

[(1339)](https://www.softwareadvice.com/crm/odoo-profile/reviews/)

Ratings Breakdown

-   4.04Ease of use
-   4.08Value for money
-   3.86Customer support
-   4.17Functionality

Pricing

Starting at $31.10 per month

Get Price

Alternative Product

[MRPeasy](https://www.softwareadvice.com/manufacturing/mrpeasy-profile/)

4.5

[(173)](https://www.softwareadvice.com/manufacturing/mrpeasy-profile/reviews/)

Ratings Breakdown

-   4.38Ease of use
-   4.52Value for money
-   4.50Customer support
-   4.37Functionality

Pricing

Starting at $49.00 per month

Get Price

## Simio Pricing and Plans

Simio has one plan. Basic is custom-priced.

Free versionFree trial

Basic

Contact Vendor for Pricing

No plan information available

Confused about pricing? We've got you covered.

Get a personalized pricing breakdown tailored to your specific needs—no guesswork, no generic estimates.

### How does Simio pricing compare to alternatives?

Explore how Simio's pricing and plan options compare with top alternatives below.

| Product | Starting price | Free trial | Free version | Value for Money |
| --- | --- | --- | --- | --- |
| Simio4.7[(104)](https://www.softwareadvice.com/manufacturing/simio-profile/reviews/) | Free | Available | Available | 4.5 |
| [Fishbowl](https://www.softwareadvice.com/manufacturing/fishbowl-inventory-manufacturing-profile/)4.2[(1,134)](https://www.softwareadvice.com/manufacturing/fishbowl-inventory-manufacturing-profile/reviews/) | Pricing available upon request | Available | Not available | 4.1 |
| [SYSPRO](https://www.softwareadvice.com/erp/syspro-profile/)4.2[(105)](https://www.softwareadvice.com/erp/syspro-profile/reviews/) | $50.00 /user/mo | Available | Not available | 4.1 |
| [Katana Cloud Inventory](https://www.softwareadvice.com/manufacturing/katana-mrp-profile/)4.6[(171)](https://www.softwareadvice.com/manufacturing/katana-mrp-profile/reviews/) | $299.00 /mo | Not available | Available | 4.4 |
| [Odoo](https://www.softwareadvice.com/crm/odoo-profile/) 4.2[(1,339)](https://www.softwareadvice.com/crm/odoo-profile/reviews/) | $31.10 /user/mo | Available | Available | 4.1 |

Simio4.7[(104)](https://www.softwareadvice.com/manufacturing/simio-profile/reviews/)

* * *

Starting price

Free

Free trial

Available

Free version

Available

Value For Money

4.5

-   [Fishbowl](https://www.softwareadvice.com/manufacturing/fishbowl-inventory-manufacturing-profile/)4.2[(1,134)](https://www.softwareadvice.com/manufacturing/fishbowl-inventory-manufacturing-profile/reviews/)
    
    * * *
    
    Starting price
    
    Pricing available upon request
    
    Free trial
    
    Available
    
    Free version
    
    Not available
    
    Value For Money
    
    4.1
    
-   [SYSPRO](https://www.softwareadvice.com/erp/syspro-profile/)4.2[(105)](https://www.softwareadvice.com/erp/syspro-profile/reviews/)
    
    * * *
    
    Starting price
    
    $50.00 /user/mo
    
    Free trial
    
    Available
    
    Free version
    
    Not available
    
    Value For Money
    
    4.1
    
-   [Katana Cloud Inventory](https://www.softwareadvice.com/manufacturing/katana-mrp-profile/)4.6[(171)](https://www.softwareadvice.com/manufacturing/katana-mrp-profile/reviews/)
    
    * * *
    
    Starting price
    
    $299.00 /mo
    
    Free trial
    
    Not available
    
    Free version
    
    Available
    
    Value For Money
    
    4.4
    
-   [Odoo](https://www.softwareadvice.com/crm/odoo-profile/) 4.2[(1,339)](https://www.softwareadvice.com/crm/odoo-profile/reviews/)
    
    * * *
    
    Starting price
    
    $31.10 /user/mo
    
    Free trial
    
    Available
    
    Free version
    
    Available
    
    Value For Money
    
    4.1
    

## Simio Features

-   Popular features found in Pharmacy
    
    Automatic Refills
    
    Claims Management
    
    E-Prescribing
    
    Forms Management
    
    Medication Database
    
    Multi-Store
    
    Order Management
    
    Point of Sale (POS)
    
    Prescription Processing
    
-   More features of Simio
    
    3D Imaging
    
    Agent-Based Modeling
    
    API
    
    Automated Scheduling
    
    Capacity Planning
    
    Change Management
    
    Content Library
    
    Continuous Modeling
    
    Customizable Reports
    
    Design Analysis
    
    Design Management
    
    Direct Manipulation
    
    Discrete Event Modeling
    
    Distribution Management
    
    Drag & Drop
    
    Dynamic Modeling
    
    EDI
    
    For Aerospace Industry
    
    Graphical Data Presentation
    
    Industry Specific Database
    
    Inventory Management
    
    Material Requirements Planning
    
    MES
    
    Monte Carlo Simulation
    
    Predictive Analytics
    
    Presentation Tools
    
    Production Management
    
    Quality Management
    
    Real-Time Data
    
    Reporting/Analytics
    
    Reporting & Statistics
    
    Resource Management
    
    Scenario Planning
    
    Scheduling
    
    Search/Filter
    
    Third-Party Integrations
    
    What-if Analysis
    

## Simio Integrations

Microsoft Azure

Integration rated undefined from -1 review

## Simio User Reviews

## Simio customer ratings

- Overall rating: 4.7/5
- Total reviews: 104

### Rating distribution

- 5 stars: 73 reviews (70%)
- 4 stars: 29 reviews (28%)
- 3 stars: 2 reviews (2%)
- 2 stars: 0 reviews (0%)
- 1 star: 0 reviews (0%)

### Secondary ratings

- Ease of use: 4.2/5
- Value for money: 4.5/5
- Customer support: 4.6/5
- Functionality: 4.6/5

---

### Makes Simulation fun and easy

- Overall rating: 5/5
- Reviewer: Samridh S.
- Verified reviewer: Yes
- Industry: Mechanical or Industrial Engineering
- Company size: 501-1000 employees
- Product usage: Used weekly for less than 6 months
- Reviewed: April 2019
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

Simio is an extremely powerful tool and it really makes one's life so much easier for simulations. Simio also does have a workbook that has lot of exercises that one can go through and learn a lot about the software. Once one has their head grasped around the concept, this software can save time, money, effort and provide accuracy.

#### Ratings breakdown

- Ease of use: 4/5
- Value for money: 5/5
- Functionality: 5/5

#### Pros

I absolutely love using Simio. It is such a powerful tool and it makes sense why the premium paid version is so expensive. However the biggest pro I see is that there is a free version that can be used which can help one understand the world of simulation. Simio has everything one needs to perform the complicated simulation process that otherwise would require us to write 100s of lines of code and make debugging difficult and daunting. I have been using Simio to do various distribution simulations such as uniform, exponential, triangular and so on and I don;t have to think how to do random number generation. Simio has so much more tool such as I love the reliability function where i can define what are likelihood of a machine failing and how much it would affect my throughput and productivity due to the varying repair times. The best part of Simio is that you can see the live simulation of your system in real time. Create a simulation for a M/M/1 queuing system to replicate a ice-cream store and watch how your customers arrival and service times affects your business. Fun part of simio is one can actually assing model entities with actual people and replace boxes with actual images which makes the presentation part of your system more engaging with the team. if you are a simulation guy/girl/business this software has everything one needs to validate, verify the architecture and answer questions that is not possible to be solved analytically.

#### Cons

It is lot of work to learn this software and there are not much resources online readily available. Most resources are integrated to Simio and so looking at videos provided by Simio and reading the help section is the way to go. The free software however cannot simulate really huge simulation system and at that point one needs to purchase the paid version. getting around the software is daunting and there are lot of aspects one needs to know to figure out how to create their system.

---

### User friendly and great support

- Overall rating: 5/5
- Reviewer: Verified Reviewer
- Verified reviewer: Yes
- Industry: Government Administration
- Company size: 10000+ employees
- Product usage: Used daily for more than 2 years
- Reviewed: September 2018
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

I learned on Arena in school but have been using Simio for 4-5 years now in a professional setting and it has been great.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

Simio has been easy to learn and allows great flexibility and power for modeling different scenarios. Additionally, the company has been great to work with and the staff is very knowledgeable, friendly and accessible. You can tell they have a great company culture.

#### Cons

On bigger models it can run a little slow, but this is probably mainly a hardware issue or a lack of modeling efficiency on my end.

---

### STEEP learning curve

- Overall rating: 3/5
- Reviewer: Verified Reviewer
- Verified reviewer: Yes
- Industry: Design
- Company size: 51-200 employees
- Product usage: Used other for free trial
- Reviewed: July 2019
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

#### Ratings breakdown

- Ease of use: 1/5
- Functionality: 4/5

#### Pros

The visualizations in this software are out of this world, some of the best I've seen.

#### Cons

The learning curve on this software is steep, very steep.

---

### Excellent software for handling complex simulations.

- Overall rating: 5/5
- Reviewer: Ashley R.
- Verified reviewer: Yes
- Industry: Information Technology and Services
- Company size: 10000+ employees
- Product usage: Used other for less than 12 months
- Reviewed: August 2018
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

#### Ratings breakdown

- Ease of use: 4/5
- Functionality: 4/5

#### Pros

Simio software consists of standardized library. In order to focus on the visuals and to forget the analysis, this software is really easy for creating simulation models. It is no doubt the superb choice for business. It is quite easy to learn while other simulation software are quite difficult to learn comparatively. Its functionalities are really awesome with less time consuming. No doubt best ever simulation software. Matchless software with fantastic 3D animations.

#### Cons

There are not any specific cons about this software. Simulation is mostly written in graphical programming language which is no doubt easy for small and quick designs but as we move further this software is failed to navigate while discussing large and complex simulations. Above discuss is the only con I can hardly think of.

---

### Taught simulation in an analytics class using Simio

- Overall rating: 5/5
- Reviewer: Maciek N.
- Verified reviewer: Yes
- Industry: Higher Education
- Company size: 1001-5000 employees
- Product usage: Used other for more than 2 years
- Reviewed: June 2018
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

#### Ratings breakdown

- Ease of use: 5/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

The support tools available for Simio are incredible. There are tutorial videos for every level of user and it's very easy to pick up quickly. The software itself is fairly intuitive and you can have simulations created from scratch in a matter of minutes.

#### Cons

I don't really have any cons that I can think of, maybe navigating from one area of Simio to another can be confusing every now and then.

---

### Simio: the simplest, most complete way to run your systems simulation and analysis

- Overall rating: 5/5
- Reviewer: Luís P.
- Verified reviewer: Yes
- Industry: Facilities Services
- Company size: 10000+ employees
- Product usage: Used weekly for less than 12 months
- Reviewed: August 2018
- Review source details: This review was submitted organically. No incentive was offered

I used SIMIO as part os my Masters course in Industrial Engineering in order to develop a fictional environment and search for better configurations, on an iteractive process. The software easily allowed me to manipulate the system in order to achieve my objectives, it is well designed and is customizable to great extent.

#### Ratings breakdown

- Ease of use: 4/5
- Value for money: 5/5
- Customer support: 5/5
- Functionality: 5/5

#### Pros

Easy of use and very intuitive when you get introduced with the basic. It allows for easy creation, editing and analysis of complex systems simulation.

#### Cons

Advanced functions might get hard to use if you don't have an experienced user helping you. Error messages could be more explicit and create a reference to where the configurational conflict lies.

---

### Simio is not exactly what we expected but gives more than anticipated

- Overall rating: 4/5
- Reviewer: Danial M.
- Verified reviewer: Yes
- Industry: Automotive
- Company size: 1001-5000 employees
- Product usage: Used monthly for less than 2 years
- Reviewed: June 2018
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

Simio certainly delivey more realistic results than the simple spread-sheet based calculations we used previously, however you really need to invest a vast amount of effort in the model to be able to get an accurate and believable result.

#### Ratings breakdown

- Ease of use: 3/5
- Value for money: 4/5
- Customer support: 4/5
- Functionality: 5/5

#### Pros

The program gives an incredible amount of information and is far more accurate than the spread-sheet based caclulations we used in the past.

#### Cons

Setup of a true working model is very complicated and terribly time consuming. This is not a simple "drop in a box or two to make a production line and there it works" type of program, you need to invest the time using accurate input information in order to be able develop a true working model. Thereafter you need to keep updating your models in order to keep them relevant.

---

### Excellent but I spend a lot of time trying to model my specifics.

- Overall rating: 5/5
- Reviewer: Luis A. M.
- Verified reviewer: Yes
- Industry: Higher Education
- Company size: 501-1000 employees
- Product usage: Used weekly for less than 2 years
- Reviewed: June 2018
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

Very easy to use

#### Ratings breakdown

- Ease of use: 3/5
- Value for money: 5/5
- Customer support: 4/5
- Functionality: 5/5

#### Pros

The amount of documentation is very good. The one prepared by SIMIO is excellent. It is very easy to use.

#### Cons

If I have a specific doubt, I spent a lot of time trying to figure out how to solve it. I need a very good computer to run smoothly.

---

### Fantastic simulation software

- Overall rating: 4/5
- Reviewer: FC T.
- Verified reviewer: Yes
- Industry: Retail
- Company size: 1001-5000 employees
- Product usage: Used monthly for less than 12 months
- Reviewed: November 2018
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

We use this software to model some of our DC processes currently and will expand this over time to model more of our supply chain.

#### Ratings breakdown

- Ease of use: 4/5
- Functionality: 5/5

#### Pros

Endlessly customizable - you can pretty much model any process within your business and test variations quickly without investing in expensive prototyping processes.

#### Cons

Its plugin and extension functionality is still fairly basic and not as user friendly as it could be.

---

### Useful tool for simulation

- Overall rating: 5/5
- Reviewer: Vahid A.
- Verified reviewer: Yes
- Industry: Higher Education
- Company size: 2-10 employees
- Product usage: Used weekly for less than 6 months
- Reviewed: September 2019
- Review source details: This reviewer was invited by us to submit an honest review and offered a nominal incentive as a thank you.

All in all, it is great simulation software. I am using it for educational purposes and so far I am completely happy with it.

#### Ratings breakdown

- Ease of use: 5/5
- Functionality: 5/5

#### Pros

-It is completely User-friendly -Very easy to learn -Lots of exercises which help to learn the software

#### Cons

-It is running a little slow in big simulation models -There are not enough tutorials on the internet

---

Showing 1 - 10 of 104 Reviews

[See All Reviews](https://www.softwareadvice.com/manufacturing/simio-profile/reviews/)

## Simio Popular Comparisons

[SYSPRO vs Simio](https://www.softwareadvice.com/manufacturing/simio-profile/vs/syspro/)[Odoo vs Simio](https://www.softwareadvice.com/crm/odoo-profile/vs/simio/)

[Compare All Alternatives](https://www.softwareadvice.com/manufacturing/simio-profile/alternatives/)

## Other Top Recommended Pharmacy Software

[Epicor Propello](https://www.softwareadvice.com/retail/epicor-retail-cloud-profile/)

**4.0** (5)

Recently recommended **15** times

[LS Retail](https://www.softwareadvice.com/hotel-management/ls-central-profile/)

**4.3** (125)

Recently recommended **6** times

[NetSuite](https://www.softwareadvice.com/accounting/netsuite-financials-accounting-software-profile/)

**4.2** (2085)

Recently recommended **4** times

[Datascan Pharmacy Software](https://www.softwareadvice.com/product/449162-Datascan-Pharmacy-Software/)

**4.9** (163)

Recently recommended **1** times

Stuck Between Options?

Our experts can help you compare Simio with other top options, so you can find the best fit for your needs.

## See what companies are saying about Software Advice